Showing posts with label Edinburgh. Show all posts
Showing posts with label Edinburgh. Show all posts

Sunday, 27 April 2014

Heading for Home!

Intro

Thank you for logging onto our blog!   This webiste is dedicated to recording the events and experiences of Highland Charge 2014, which we have just completed on Sunday 27th April 2014.

Having participated in 2 great motorshows (GreenFleet and Evolution 2014), there was no reason but to head for home - mission accomplished!

When the show organiser announce '30 mins to close' - it seems to be a trigger to drop and wrap all displays!  In 2 mins the halls looked bare - all car exhibits in place - but banners were into cases in seconds and brochues and laptops disappeared into boxes!  I think the remaining visitors were a bit startled - 5 mins later they were gone!

We followed suit and stowed our gear!  However, before leaving we did have a few thank you's to make to adjacent stands and to the show organisers.  We were happy to share a dozen or more jars of Auntie Val's Marmalade, with the Team Green Motorsport logo - we hope they enjoy the excellent marmalade - just a much as we enjoyed their company for the 3 days at the Royal Highland Showground.

16.30 and it was like the start of the Grand National - roller-doors up and cars shot our line-astern!  Although we were on a stand far from the main exits, we did have a door that led onto a wood-chipped back lane.  Although nearest to the doors we were beaten to it by the 'professionals'!  We picked our way through the chaos of the 'pit lane' as gleaming saloons rattled up the steel ramps onto giant transporters!   

The Journey South Day - 1: Edinburgh - Scotch Corner (160 Miles)


 View Larger Map
Our strategy for travelling the 400 miles from Edinburgh home was straightforward - join up the shortest distance between rapid chargers - with due regard to serviceability.  The only sector where there could be uncertainty was between Edinburgh and Newcastle, which is reliant to the serviceability of the Newtown Boswell.  The A1 route was rejected because of the additional distance and time.

Although it was only 48 miles to our first stop at Newton St Boswells, our recollection from 2013, was that there was a significant sustained uphill gradient - so plan A was to top up the battery at the Edinburgh IKEA and make the stop optimal, by taking a meal.  Alhough it had been serviceable the evening before - we found it U/s when we got there.  We had a meal but we aere losing time!  We were luckiy enough to have a Nissan dealership nearby (Nobles of Loanhead) and they were simply superb!  They recogised the car from the motorshow and despite charging a non-Nissan was not a problem!

So AF Noble, Nissan Dealler you get ***** for a most friendly service!  

Jedburgh - a 'must see' town!
We left Edinburgh about 6 pm nearly an hour later than planned it was a glorious evening to climb the Cheviot hills heading south towards Newtown St Boswells.  We arived at the Borders Council Offices with a range of 19 remaining - so the top-up was not absolutely necessary.  However, in terms of peace-of-mind the top-up was a valid decision.

Jedburgh - History and Character!
The next leg had a similar dilemma - the next rapid charger was at the Gateshead Metrocente 72 miles away - possible on wing-and-a-prayer, but imprudent!  So we had option for 'fast' charging at Jedburgh (9 miles on) - or Pontisland (9 miles short of Gateshead).  So which do we choose?  Jedburgh, of course!  Its a beautiful town with an Abbey and we would be there before dark.

The climb up from Jedburgh (about 400ft) nobbled the range severely and we were in range-deficit within 20 miles.  However, having taken account of the road profile (nothing scientific) from previous visits we were optimistic that the range would recover.  It happened very much that way and we were able to pass Pontisland with a range of 20 miles (with 11 miles to go).

Gateshead Metrocentre was a ghost town at 9pm - not even street lights.  As we pulled up to the 'rapid' charger a security guard appeared from the shadows.  I'm not sure if he thought we were about to steal the big white box!

The remainder of the day was straightforward and we arrived a the Travelodge, Scotch Corner, without delay.  We parked the Ecotricity 'rapid' charger and settled in our room - feeling smug that we had done a full days exhibition and still managed to get 1/3rd of the distance home - by EV!

The Journey South Day - 2: Scotch Corner - Wokingham (260 miles)


View Larger Map
Sunday morning we were ready faily early - keen to ensure that we made it home within the day.  Fitst cahllenge was to get th charger to go over 82%; however, when we realised that Wetherby was within range we quickly logged out and got rolling.  All though we had morning tea, teh judgement was to have breakfast at the first stop!  Optimisng the time use - maybe 'Breakfast at Greggs' would not be my 1st choice - tehy do a very fine 'Bacon Butty' and since were 'up North', that was our choice!

Leicaster East was to be the next stop maybe too soon for morning coffee - but we were pleased to pass the half-way point on the return journey - and it was still early!

Our journey was about to take a turn for the worse - however!  We had an appreciation of the serviceability of chargers ahead, but felt confident that there was enough!   Northampton N-bound, would get us to IKEA and on to Chargemaster, Luton.  All others were 'red-flagged'!   However, Northampton turned out to have an earthing fault - with Newport Pagnell N&S both out - our only choice was IKEA, at Milton Keynes.  Or range was marginal - but there seemed no choice.  We duly arrived at IKEA with a range of -4miles - yes we met the Green Turtle for the 2nd time, ever!   However, the IKEA 'rapid' was down.  We blagged a 13 amp socket, had lunch and set off of the MK Coachway, which was working, we were out of trouble - we thought!

With Toddington N&S U/s prudence told us to take a top-up at Chargemaster, Luton - its status is not declared anywhere, but it has been reliable. However, it too was broken!   Not a problem - next charger is at Nissan (Maple Cross) - though its not reported either!  It too was broken!

We were suddenly starting to look critical!   We were 30 miles from home, with a range remaining of 11 miles and we had been travelling for 8 hours already.  Any 'fast' charge would take 3-4 hours and we really did want to get home!  So out with the iPad - the panacea for all navigation issues!  The nearest 'rapid' charger would be at Heston, well W of our planned route - but according to the GPS we would fail by 4-5 miles!  However, Google Maps suggesed we could make it - if we took a direct route and entered the service area from the back entrance!  This link will how we reduced the distance by at least 1/3rd!

Maple Cross - Heston Direct!

We were delayed at Heston by a LEAF on charge - the family had been having a weekend away in Windsor and had been worried about getting the range down to 20 miles - I didn't dare tell them that we had got there 'on a wing and a prayer'!
We arrived home at 2010 - just in time to boot the Mac and join the EVDA Board Meeting!

If we had wanted to claim Edinburgh to London, in day - then we could have taken the M1, charged at London Gateway and photgraphed Marble Arch - with an hour to spare!   But that's been done by two stubbly blokes in a LEAF who went to Edinburgh on Burns Night and stayed sober!  We turned W on the M25, got delayed by another charger outage and arrived home in 24 hours and 10 mins!

We didn't claim a record - I had travelled with my wife - stayed in a comfortable hotel - had every meal at a cafe, or restaurant - and enjoyed the whole experience!   We just went home - had a pleasant meeting with our buddies at EVDA and toasted and epic trip with a glass of Merlot!

Travelling long distance in a short range EV is not rocket science - its just a matter of good planning and good decision making!  You just take the journey at a gentle pace - making sensible charging choices and dont panic when range starts to get critical!  Be wary of using an in-car GPS - they are not optimised for an EV.  Always travel with tablet computer, or smart phone - but use it to find 'last resort' charging - not to call recovery!


Saturday, 12 April 2014

Edinburgh - 2 nights



Work in progress!!!!!!

Location, Location, Location

Well here we are in Edinburgh in a lovely apart-hotel overlooking the Moray firth and only 5 mins from the location of tomorrow's seminar "Investing in EVs" - see http://www.e-cosse.net/events/event-registration/?ee=7

It was great to awake up and gaze from our aparthotel window, on the Firth of Forth, with a clear view of the entrance to the Leith docks.  Lucky enough to see a very passive looking frigate being towed into the dockyard.  However, yet again an early start - no time to stop and stare - I had to wash the road dirt from yesterday 260 miles dash.   Rearrange the exhibition stuff - out of side - and all personal stuff removed!

Fortunately, we were no due until 9 am, so I was able to enjoy breakfast

On Display at Scottish Government HQ building 

I was duly met by Gillian Milne from Transport Scotland and directed to the agreed parking space right under the Portico of the Scottish Government HQ, at Victoria Quay in the heart of this historic dockyard.  I've been to Edinburgh many times, going decades, but Leith was not a corner of the city that we would have considered visiting.   However, it is certainly a model city for urban/ docklands rejuvenation.  There are lots of stunning building being retained and an almost equal number of dynamic modern buildings! 






 The Mitsu was looking pretty cool in the long shadow of the early morning - the St Andrew and St George flags were showing their full colour!   The WAVE banner was also on full show - outlining the WAVE principles!  Not to mention the planned 2000+ mile route!











E-cosse Symposium -Investing in EVs

PLACE HOLDER - No time to complete back soon!




Touring Edinburgh (p.m.)


Highland Charge makes a call at the Scottish Parliament - it was on Easter Break!










This is what Edinburgh folk consider to be a good short range EV!



Doncaster to Edinburgh in a Day - Day 3

Travelling through Yorkshire has always been a challenge for EVs - North and South Yorkshire CCS completely missed the boat on the Plugged-in-Places Scheme.  Yorkshire has been described as an EV Black Hole.  We couldn't use Wetherby and were therefor forced to route via York.  York has been my bete noire trying to get to Whitby and I spend hours after midnight waiting for Waitrose 13 amp Chargemaster to deliver enough uumph to cross the moors.

I had already ruled out detours to Z-Car nr Hull and the duty visit to family in Whitby, so my wife and co-driver had been asked to come to Middlesbrough.  At least my route would be a direct line N-bound on the A19.  A charge a the York Outlet Mall was the lesser of the evil, but it did take 2.5 hours, which I could barely afford.

The Middlesbrough pickup went fine (with 5 mins of ETA) and withing 15 mins were were picking up a Rapid Charge @ Wynyard and we were soon on the A1 heading for Gateshead:



PLACE HOLDER - no time to complete - must drive on!  Back soon! 


Scotland's first charger and it touch-and-go to get here!  In short range BEV like the Mitsu you run into range issues after 40 miles.  We achieved a range defciit of 6 miles before the downslope gave us enough to make Jedburgh!


Jedburgh Abbey  

Thursday, 3 April 2014

Start Approaching Rapidly - Tension Builds! (Start -5)

Apologies for not filling in the 'nitty gritty' of the last few days - but its all an iteration of planning-coordinating-booking and PR-ing.  But here is a quick review:
  • Nice chat with Calum, at Comhairle nan Eilean Siar - the council for the Outer Hebrides.  It was a warm and geneous invitation to the Outer Isles and to use the council facilites on Harris, Lewis, Benbecula and Barra!
  • Similar exchange with Calendonian Macbrayne the ferry operator and I anxiously awaiting their final agreement!
  • Photocall at the Scottish Government Building, on 11 Apr 14 - has been confirmed.
  • Lots of effort going into PR, with Press Release sent to varous agencies;
  • Received a nice response from Low Carbon Vehicle Partnership, who gave us a 'plug' on their Newsletter - see:
http://www.lowcvp.org.uk/news,new-lowcvp-member-to-compete-in-world-advanced-vehicle-expedition_2968.htm;
  • Brochures are production - at last!
  • WAVE banner (to be used on Highland Charge) has now been ordered. It looks good? 


  • First proof for the car decal - just arrived WATCH THIS SPACE!

Tuesday, 25 March 2014

Navigation Planning (Start -15)

Planning the route


Well some of the weekend was spent working up a spreadsheet will all the stops, including charge points.   There had been a concern that the introduction of charges by Chargemaster was going to acre things badly; however, ASDA have confirmed that their chargers will remain FOC and there are some critical chargers, in Scotland that are mandatory: they include Forfar, Tain and Inverness.  Each of which I need to sit on until the max to make the subsequent leg achievable.


Here is a short version of the route that was extracted for PR output:


Outbound
 


Wokingham, London, Milton Keynes, Silverstone (Fleet World Exhibition), Doncaster, Hull (Photo-call at Z-cars Engineering),Scarborough, Whitby, Metrocentre Gateshead, Jedburgh, Newton St Boswells, Edinburgh (Meet EV Assoc Scotland) + photo-calls in Edinburgh, Dundee, Forfar, Aberdeen, Grampian Transport Museum (Photo-call), Huntly, Elgin, Forres, Inverness (Various side events in the Scottish Highlands - Whisky Trail, skiing at Aviemore etc..), Inverness
 


Return
 


Inverness, Ullapool, Stornoway (various photo calls on Isles of Harris/ Lewis), Oban, Islay, Loch Fyne (Photo-call), Alexandria, Glasgow, Stirling (Photo-call), Edinburgh Ingliston (Green Fleet Scotland Exhibition)(Photo-call with Keith Brown MSP – Transport Minister), Selkirk, Hawick, Corbridge, Harrogate, Leeds – direct Wokingham


Graphics Design 


I've been collating the sponsor's logos and evaluating where to put then - based on their contribution. Clearly that was a difficult balancing act and we will have to wait some weeks to hear their views.  So a first-cut suitable for Highland Charge have been submitted to Macro Graphics Ltd of Hook, Hants - and I am anxious to get the fit date and see the overall effect! 
This was the prize winning car entered by Green Motorsport in last year's WAVE - pretty cool.  Things seemed to be easier with a white car as many of the logos are not transparent.  So Macro Graphics will have their work cut out on the EV Matters' iMiev, which is silver!

Car Preparation - Car 1 - Green Motorsport "Light Utility EV"

Well I have driven this unique prototype and it is certainly stunning.  The requirements were established by the Growing Air Foundation ( see http://www.growingairfoundation.com ) as you can read in their website they have established a programme to buy land and re-forest swathes of S.America!   They wanted an ecologically sound vehicle a a basic principle; however, of more profound influent was the need for a vehicle that could cope with the jungle terrain, cope with unmade roads and would not be dependant on long lines of supply for refuelling and maintenance!

The chassis has been made by Z-Cars (see http://www.zcarsuk.com/projects.php ) who are long installed manufactures of racing cars and special effects cars.   The drive system exploits water-cooled DC-motors designed and built by Green Motorsports.

Sadly I cannot yet post a photo; however, it will be here soon.  If I predict I may get shot!  It will be here when Green Motorsport are ready!